Numbers and Titles



Includesprocedures and general requirements for determining acceptable conditions for installation. procedures and general requirements for preparing to install, erect, or apply products.
See00 31 19 for existing condition information provided to bidders or proposers. 00 31 21 for survey information provided to bidders or proposers. 01 31 19.16 for site mobilization meetings. 01 76 00 for protecting installed construction. 01 78 29 for final site survey. 02 21 00 for surveys performed by the contractor before construction begins.
01 71 13Mobilization
01 71 16Acceptance of Conditions
01 71 23Field Engineering
01 71 33Protection of Adjacent Construction
01 71 36Non-Destructive Concrete Examination