Numbers and Titles



Includesvarious technologies to make an unstable rock slope more stable.
Alternate Terms/Abbreviationsshotcrete: gunite.
See03 37 13 for shotcrete. 31 32 33 for shotcrete for soil slope stabilization. 31 51 00 for excavation anchor tiebacks. 31 68 13 for rock foundation anchors. 31 72 13 for tunnel rock reinforcement and initial support. 31 74 19 for shotcrete tunnel lining.
31 33 13Rock Bolting and Grouting
31 33 23Rock Slope Netting
31 33 26Rock Slope Wire Mesh
31 33 33Shotcrete Rock Slope Stabilization
31 33 43Vegetated Rock Slope Stabilization