Includes | abatement or removal of asbestos material within structures, and removal of piping with coatings of asbestos-containing material (ACM), removal of ACM-contaminated pipeline coatings or coverings, cutting of pipelines containing, covered, or coated with ACM, and monitoring of work area during cutting and cleaning operations. |