Numbers and Titles



Includesconstruction at stream banks to prevent erosion from water movement.
See31 34 00 for soil reinforcement. 31 35 00 for slope protection. 31 36 00 for gabions. 31 37 00 for riprap. 32 32 36 for gabion retaining walls. 35 31 19 for gabion revetments. 35 31 26 for gabion jetties. 35 31 29 for gabion groins. 35 43 00 for scour protection.
35 42 13Piling Bank Protection
35 42 29Grout-Bag Bank Protection
35 42 34Soil Reinforcement Bank Protection
35 42 35Slope Protection Bank Protection
35 42 36Gabion Bank Protection
35 42 37Riprap Bank Protection
35 42 53Wall Bank Protection