Includes | work results for conveyance of hydrocarbons by a utility or private company, including transmission and distribution for a single site, facility, or multiple facilities. Includes handling of pipe including pipe stacking and storing; welding of conveyance pipe; pigging; and farm tap installations. |
Alternate Terms/Abbreviations | Pigging: in-line inspection (ILI), cleaning pig, gauge pig, smart pig, intelligent pig. |
See | 01 51 29 for temporary natural gas 01 53 00 for temporary pigging 01 57 13 for temporary erosion and sediment controls 09 96 00 for specialized, field-applied pipe coatings 13 47 13 for cathodic protection. 23 11 00 for fuel piping within, under, or closely associated with a building or structure. 23 12 00 for fuel pumps closely associated with a building or structure 31 23 00 for excavation and fill, including trenching. 33 05 09.43 for Tapping Sleeves and Saddles for Utility Piping. 33 56 53 for compressed gaseous hydrocarbon storage tanks. 40 05 76 for hot-tapping valves and appurtenances 40 10 00 for exposed gas process piping at a hydrocarbon facility. 40 21 00 for exposed liquid process piping at a hydrocarbon facility. 44 40 00 for water pollution control, including spill containment. |