Includesassessments of existing hazardous materials conducted by the contractor before construction begins as a project activity.
Alternate Terms/AbbreviationsPCB: polychlorinated biphenyl.
See00 31 26 for existing hazardous materials information provided to the bidders, proposers, or contractors before construction begins. 01 35 43 for environmental procedures for hazardous materials. 02 80 00 for hazardous material remediation. 02 82 00 for asbestos remediation. 02 83 00 for lead remediation. 02 84 00 for PCB remediation. 02 86 00 for hazardous waste drum handling. 02 87 13 for mold remediation
02 26 23Asbestos Assessment
02 26 26Lead Assessment
02 26 29Polychlorinated Biphenyl Assessment
02 26 33Biological Assessment
02 26 36Hazardous Waste Drum Assessment