Numbers and Titles



Includessurveys conducted by the contractor before construction begins as a project activity.
See00 31 21 for site survey information provided to the bidders, proposers, or contractors before construction begins. 00 31 21.16 for measured drawing information provided to the bidders or proposers before construction begins. 01 71 23 for field engineering during construction. 01 78 29 for final site survey.
02 21 13Site Surveys
02 21 16Measured Drawings
02 21 19Utilities Surveys