Numbers and Titles



40 80 00 Commissioning of Process Systems
Print this page
Includescommissioning of process system as a total system.
NotesField quality control testing of a particular system or equipment item is typically specified in the specification section(s) associated with the equipment item or system. Use 40 80 00 for more-extensive, systematic commissioning requirements affecting work results under multiple process equipment divisions.
See01 91 00 for procedural and administrative requirements for commissioning. 41 08 00 for separate commissioning of material processing and handling equipment. 42 08 00 for separate commissioning of heating, cooling, and drying equipment. 43 08 00 for separate commissioning of gas and liquid handling, purification, and storage equipment. 44 08 00 for separate commissioning of pollution control equipment. 45 08 00 for separate commissioning of industry-specific manufacturing equipment. 46 08 00 for separate commissioning of water and wastewater equipment. 48 08 00 for separate commissioning of electrical power generation systems.
No subclassifications exist for this item