Numbers and Titles



Includesvarious methods of specially placing concrete. Concrete placed as dry mix.
Alternate Terms/Abbreviationsshotcrete: gunite.
See03 53 00 for concrete topping. 31 32 33 for shotcrete soil slope stabilization. 31 33 33 for shotcrete rock slope stabilization. 31 52 00 for cofferdams. 31 74 19 for shotcrete tunnel lining. 32 13 16 for roller-compacted concrete paving. 35 53 00 for underwater construction.
03 37 13Shotcrete
03 37 16Pumped Concrete
03 37 19Pneumatically Placed Concrete
03 37 23Roller-Compacted Concrete
03 37 26Underwater Placed Concrete